Finalization of the Assembly.

Having finalized suspension, steering and brake systems of our car, we have designed the in wheel components and constructed our assembly.

Next step is to validate the components for production after which we are good to go.

 
Ekran Resmi 2021-08-30 11.34.15.png

Manufacture of Wings has Started.

The aerodynamic package's designs were completed via Solidworks. After the design and production research of elements,

we started to manufacturing step for the wings. To gain experience in composite materials, we are starting this step with one of the main foils as a trial production.

 
 
Ekran Resmi 2021-09-06 13.12.42.png

Developments about CAD drawings of Electronic Department.

In the first two photographs our CAD drawing showing the precharge circuit inside the accumulator container, the AIRs, the HV fuse, the IMD and the HV copper busbars.

In the third photograph, you can see our second HV box. This box has accumulator container, energy meter, pcbs, microcontroller, discharge circuit, tractive system measuring point etc.

Ekran Resmi 2021-08-30 11.44.14.png

Our high voltage action has started in SM Garage.

After we successfully spin our engine at low voltage, we aimed to reach high speed by using high voltage. For this reason, we have designed pre-charge

circuit to protect our system equipment from high voltage damages. It is also one of the requirements of the competition. We finalized the pre-charge circuit with our purchases and the tests were successful. The next stage is going to be spinning our engine at higher rev with high voltage.

 