JULY 2021

Ekran Resmi 2021-08-30 11.14.18.png

Monocoque and the tube chassis parts are completed.

With the completion of the monocoque part of our vehicle, the geometry of the tube chassis part also came to an end. This design will play an important role in resisting the load from the rear suspension arms and the vehicle's torsion.

 
Ekran Resmi 2021-08-30 11.14.27.png

Motor test brought the final stage.

As the Powertrain department, we brought our motor test to the final targeted stage by transferring the signal from the pedal to the motor driver via can-bus. In addition, discharge and error management conditions were set and tested successfully by BMS.

 
Ekran Resmi 2021-08-30 11.14.44.png

PCB drawings and circuit designs have been finalized!

Our electronics department finished all their circuit designs and PCB drawings. Now we are waiting the deliveries of these PCB's to test them in our garage!

 